LNV provided RML and Waste Disposal Well (WDW) permitting for the plant’s in-situ uranium mining process facility that was designed to produce two million pounds per year. The preliminary design included tasks for both the processing facility and the satellites. These services included site layouts, access roads, alternative facility footprints, typical piping layouts/sections, development of Process Flow Diagrams (PFDs), mass balance calculations, site drainage plans, identification and specifications of equipment and materials of construction, pad structural foundation requirements, spill containment design, decommissioning estimates, construction cost estimates, and project schedules.